2004

Azerbaijan
BAKU – TBILISI – CEYHAN (BTC) CRUDE OIL PIPELINE AND SOUTH CAUCASUS GAS PIPELINE (SCP)
BRITISH PETROLEUM
Diameter:
42 inch + 6 inch
Pipe Material:
Carbon Steel
Length:
6140 m
Soil Condition:
Clay / Limestone / Sand
category:
Canal and River Crossing
client:
BRITISH PETROLEUM
Main contractor:
CONSOLIDATED CONTRACTORS CO. (CCC)
Crossing:
7