Egypt

CAIRO – ALEXANDRIA RAILWAY CROSSING

EGYPTIAN NATURAL GAS HOLDING CO. (EGAS)

Diameter:
48 inch

Pipe Material:
Carbon Steel

Length:
372 m

Soil Condition:
Clay / Limestone / Sand

category:
Railway Crossing

client:
EGYPTIAN NATURAL GAS HOLDING CO. (EGAS)

Main contractor:
NATIONAL GAS CO. (NATGAS)

Crossing:
1

WATER SIPHONS UNDER SUEZ CANAL AT KM 47.550, 90.200, 137.300, 149.000