ETISALAT SIPHON UNDER SUEZ CANAL AT KM 0.500

TELECOM EGYPT (TE)

Diameter:
18 inch

Pipe Material:
HDPE

Length:
966 m

Soil Condition:
Clay / Limestone / Sand

category:
Canal Crossing

client:
TELECOM EGYPT (TE)

Main contractor:
CANAL MOORING & LIGHTS CO.

Crossing:
1

ELECTRIC SIPHONS UNDER NEW SUEZ CANAL AT KM 90.300