2015
Egypt
FUEL SIPHONS UNDER NEW SUEZ CANAL AT KM 71.700, 73.150, 85.270, 87.300
EGYPTIAN ARMED FORCES
Diameter: 6 inch
Pipe Material:
Carbon Steel
Length:
1185 m
Soil Condition:
Clay / Limestone / Sand
category: Canal and Road Crossing
client: EGYPTIAN ARMED FORCES
Main contractor: CANAL MOORING & LIGHTS CO.
Crossing: 1