2015
Egypt
MIDOOR – EL-MAX DIESEL PIPELINE
PETROLEUM PIPELINES CO. (PPC)
Diameter: 20 inch
Pipe Material:
Carbon Steel
Length:
1508 m
Soil Condition:
Clay / Limestone / Sand
category: Canal and Road Crossing
client: PETROLEUM PIPELINES CO. (PPC)
Main contractor: PETROLEUM PROJECTS & TECHNICAL CONSULTATIONS CO. (PETROJET)
Crossing: 1