2014
U.A.E. / Abu Dhabi
N-4268.2 MUSSAFAH WATER TRANSMISSION SCHEME (MWTS) / WS47 GRID STATION
ABU DHABI TRANSMISSION & DESPATCH COMPANY (TRANSCO)
Diameter: 4 inch
Pipe Material:
HDPE
Length:
120 m
Soil Condition:
Clay / Limestone / Sand
category: Road Crossing
client: ABU DHABI TRANSMISSION & DESPATCH COMPANY (TRANSCO)
Main contractor: AYDINER CONSTRUCTIONS
Crossing: 1