2002
Egypt
WATER SIPHONS UNDER SUEZ CANAL AT KM 142.850
SINAI RECONSTRUCTION
Diameter: 28 inch
Pipe Material:
HDPE
Length:
680 m
Soil Condition:
Clay / Limestone / Sand
category: Canal, Tunnel and Road Crossing
client: SINAI RECONSTRUCTION
Main contractor: CANAL MOORING & LIGHTS CO.
Crossing: 2