2006
Egypt
WATER SIPHONS UNDER SUEZ CANAL AT KM 47.830 EL-QANTARAH
SINAI RECONSTRUCTION
Diameter: 24 inch
Pipe Material:
HDPE
Length:
645 m
Soil Condition:
Clay / Limestone / Sand
category: Canal, Railway and Road Crossing
client: SINAI RECONSTRUCTION
Main contractor: ARAB CONTRACTORS CO.
Crossing: 1